Hamilton
level 1 and level 2 framing delivered and set up. Scaffolding level 1/ 2 and nets protection are installed. IT wall and fire rated wall are installed. Steel beam and portal have been delivered and installed. Window manufacturer in processing. Level 1 stair void area Safety nets are installed.